ALE Heavy Lifting was awarded the job of lifting the underground line at Earls Court. Lifting the old underground line reduced the time for ground preparation for building new homes as well as the realisation of Lost River Park by 2 years.

Extra fire safety measures

It was decided to do as much work as possible at night so that the residents of London would have as little trouble as possible. In addition, additional fire safety measures were required because the project was carried out in the middle of a residential area.

The crane’s technical areas had to be fitted with a fire extinguishing system. A total of four AF-X Fireblocker installations have been installed.

AF-X Fireblocker simplicity and price-wise the most interesting

To make transport possible, this “mega” crane must be disassembled .

  •     Simplicity
  •     Plug & Play
  •     Compact
  •     No piping
  •     Pressureless

These advantages and the fact that the AF-X Fireblocker price is the most interesting, were decisive for choosing AF-X Fireblocker.

Full Reference sheet & Technical data of the AF-X Fireblocker system in W Hotel? Download the PDF version of the reference with detailed data.

Do you want to be our partner in your country?

Call +31 20 20 50 484 or send us an email at frank@af-x.com and we will contact you immediately.